国产精品无码AV无码,蜜臀久久久久久999草草,啊灬啊别停灬啊灬快点,美女露0的无挡写真

Your Position: Home > News > Activities

Installation and Daily Maintenance of Roots Pump of Oil Filter

2019/8/1??????view:

  In the operation, hoisting, installation, use and maintenance of equipment, the correct processing procedures must be strictly followed.

  Once improperly operated, the internal or external transmission parts and driving equipment of the pump may also cause serious damage to the human body. It is strictly forbidden to start the vacuum pump when the intake cover or exhaust cover of the pump and the refueling and discharging ports are dismantled. If we want to check or maintain the moving parts of the pump, we must first completely cut off and lock the control power equipment.

  Higher temperature on the surface of roots pump housing and connecting pipes and accessories may cause injury when human body contacts.

  1.Dismantling and hoisting

  1.If the pump is packed in wooden cases, care should be taken not to touch the shell of the pump when it is unpacked.

  2.If the pump does not have a lifting ring, it must be lifted with hemp rope at the front and rear end caps of the pump or carried by forklift truck.

  2.Installation site:

  Roots vacuum pump should be installed in bright, dust-free and well ventilated buildings.

  The installation environment temperature of Roots vacuum pump is 5-40 C.

  There should be enough room around Roots vacuum pump for routine inspection, maintenance, disassembly and assembly.

  3.Fondation works:

  Roots vacuum pump can be installed on the same rack as the front pump to form a unit and then installed on the concrete foundation. Large pumps can be installed on the cement foundation separately, and the reserved holes of foundation bolts can be watered with concrete.

  According to the weight of Roots vacuum pump and the pressure resistance of foundation, the compressive area and depth of concrete foundation are determined.

  In order to bury foundation bolts in concrete, sufficient voids must be left out according to the location of foundation holes when concrete foundation is poured.

  The base surface must be horizontal.

  4.Installation:

  Wood frame is made according to the position of bottom foot hole of pump or unit. The foundation bolt is fixed on the wooden frame, placed in the reserved hole, and then concrete is poured into the reserved hole, placed for several days, and the wooden frame is removed after concrete hardening.

  The roots vacuum pump is put on the foundation, the level is calibrated with a level meter, the uneven part is hardened with metal gaskets, the foundation bolts are tightened, and the bottom cracks are filled with cement.

  5. Pipeline installation:

  Notes: If welding slag and other foreign matter enter the pump during pipeline installation, Roots pump and front pump will be met.

  Cause serious damage or damage, once similar situation occurs, the pipeline and pump must be strictly cleaned up.

  There are no foreign bodies such as welding slag and impurities in the intake and outlet gas pipelines, which have sufficient channel capacity.

  A flexible hose should be installed in the connecting pipe between the outlet of Roots vacuum pump and the inlet of the front stage pump to reduce the influence of vibration of the front stage pump on the Roots vacuum pump.

  In order to shorten the pre-pumping time, besides connecting the inlet of the front pump with the outlet of Roots vacuum pump, bypass pre-pumping pipes and valves can also be installed in the general system.

  In order to prevent the return of oil or water when the front pump stops (when the front pump adopts water ring vacuum pump), the exhaust valve or check valve should be installed on the inlet pipe of the front pump.

  The connection flange of the pipeline is sealed with O-type rubber sealing ring and coated with vacuum coke grease. The whole vacuum system must be sealed without leakage.

  If the pipeline is too heavy, it must be properly supported. In order to avoid affecting the normal operation of the pump

  Vacuum pumps equipped with cooling water shall be equipped with adjusting valves on the pipes at the cooling water inlet in order to control the amount of water.

  6. Installation of electrical equipment:

  Roots vacuum pump can only work within the prescribed inlet pressure range. When the current stage pump stops working, Roots vacuum pump must stop working at the same time. Therefore, electrical equipment must have interlocking and necessary automatic overload and overheating protection devices.

  The wiring of the motor must make the steering of the pump in the direction indicated by the arrow.

  Small pumps can start directly. Large pumps should be equipped with starters, such as pressure-reducing starter.


人妻无码中文字幕| 又硬又粗又长又大时间持久| 野花 高清 中文 免费 日本| 亚洲AV片不卡无码久久| 亚洲精品AV无码喷奶水网站 | 国产高潮国产高潮久久久久久| 久久精品国产欧美激情无码| 国产香蕉97碰碰久久人人| 小13箩利洗澡无码视频网站| 含紧一点H边做边走动| 亚洲伦产精品一区二区三区| 极品少妇被猛的白浆直喷白浆| 亚洲色无码A片一区二小说| 粗大猛烈进出高潮视频大全| 95免费视频在线观看| 青青久久久久精品亚洲AV中文| 色综合久久久久久久久五月| 97无码免费人妻超级碰碰夜夜| 精精国产xxxx视频在线| 扒开双腿猛进入喷水高潮视频 | HEYZO无码中文字幕人妻| 无码无套少妇毛多18P| 欧美激情A∨在线视频播放| 精品人妻一区二区三区四区| 欧美边做饭边被躁BD在线看| 国产又黄又爽又湿的免费网站| 久久AV无码AV高潮AV不卡| A片粗大的内捧猛烈进出视频| 国产伦精品一区二区三区不卡| 日本极品少妇的粉嫩小泬图片| 久久精品国产9久久综合| 掀开奶罩边躁狠狠躁视频0000 | 啊灬啊灬啊灬快灬深用力| 无码免费人妻A片AAA毛片| ASS年轻少妇BBWPICS| 久久久精品人妻一区二区三区四| 亚洲婷婷五月综合狠狠爱| 最近日本韩国高清免费观看| 国产日韩欧美一区二区东京热| 亚洲国产成人精品无码区在线秒播| 日韩人妻精品一区二区三区视频|