国产精品无码AV无码,蜜臀久久久久久999草草,啊灬啊别停灬啊灬快点,美女露0的无挡写真

Your Position: Home > Support > FAQ

Installation of Safety Gas Ballast Valve for Vacuum Oil Filter

2019/8/1??????view:

  Installation of selected ballast valves

  SOGEVAC SV200-300 with air ballast valve or SOGEVAC SV200-300 without air ballast valve can be selected according to customers'requirements. Gas ballast valves also have various models.

  Remove the fastening screw at the top of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom of the cover (7/94), and remove the cover.

  Put the oil out.

  Remove screw (6/13) and gasket.

  Install the selected air ballast valve (6/14) with bolts and gaskets.

  Re-fitting and oil filling.

  Note:

  LEYBOLD USA sells pumps, standard air ballast valves are standard equipment.

  Repair

  warning

  Cut off the power supply before removing the pump. It must be absolutely guaranteed that the pump can not start accidentally.

  warning

  If the pump has pumped harmful substances, it is necessary to understand the nature of the hazards and take appropriate safety measures.

  Comply with all safety regulations.

  Maintenance of LEYBOLD Maintenance Station

  If you send the pump to LEYBOLD maintenance station, please indicate whether the pump has any substances harmful to human health, or whether it is contaminated. If the pump has been polluted, the nature of the hazard must be explained. For this purpose, you must use the form we have prepared, which will be provided to you as required.

  At the end of the instruction sheet, there is a copy of the form "Instructions for Contamination of Vacuum Equipment and Components".

  Please attach this form to the pump or pack it with the pump. This description is needed to meet the requirements of regulations and protect our staff.

  If there is no "pollution instructions", the LEYBOLD maintenance station will return the received pump to the shipper's address.

  warning

  The packing of the pump must be guaranteed that the pump will not be damaged during transportation, so that harmful substances will not spill over from the packing box.

  If you turn on the pump in your own factory, also pay attention to whether there is pollution.

  Important Notes

  When handling used oil, please observe the relevant environmental regulations.

  According to the design idea, the SOGEVAC pump needs very little maintenance under normal working conditions. The required maintenance work is described in the next section.

  All work must be performed by trained personnel. Improper maintenance or overhaul will affect the life and performance of the pump, and affect the claim for warranty.

  Daily maintenance system

  The maintenance frequency described in the daily maintenance system is the approximate value of the normal operation of the pump. Maintenance times should be increased under adverse environmental conditions and/or corrosive media conditions.


师娘求放过完整高清在线看| 亚洲中文字幕无码AV| 精品乱人伦一区二区三区| 日日噜狠狠噜天天噜AV| 亚洲老熟女AV一区二区在线播放| 成人欧美一区二区三区黑人| 暴力强奷漂亮女教师在线观看| 解开警花的裙子猛烈进入| 被黑人扒开双腿猛进| 欧美精品九九久久久久久久久 | 中文字幕人妻无码乱精品| 亚洲午夜久久久久久久久电影网| 国产亚洲大尺度无码无码专线| 学生小嫩嫩馒头在线观看| 办公室双腿打开揉弄高潮淑芬| 人妻少妇精品无码专区APP| 女人与公拘交酡全过程| 国产A V无码专区亚洲AV| 娇妻在厨房被朋友玩得呻吟| 美女露0的胸无挡视频| 伊人久久综合精品无码AV专区| 免费A级毛片无码A∨免费软件| 老头猛吸女大学奶头A片| 人澡人爽人妻精品A片二区 | 国产精品人妻久久久久| 凹凸精品视频视频学生AV| 小洁和公H文翁17| 免费高清理伦片A片在线观看 | 我的小后妈韩国免费播放| 99精品丰满人妻无码A片| 在线精品无码字幕无码AV| 初次尝了销魂少妇邻居| 少妇AAA级久久久无码精品片| 15女上课自慰被男同桌看到了| 欧美XXXXXBBBB| 无人视频在线观看免费播放| 精品一区二区三区无码免费直播| 亚洲V欧美V国产V在线观看| 久久妇女高潮喷水多长时间 | 欧美RAPPER潮水抽筋| 婷婷人人爽人人爽人人片|